Fourier-domain low-coherence interferometry for differential mode delay analysis of an optical fiber
Related Experiment Video
Updated: Aug 6, 2026

Transmission of Multiple Signals through an Optical Fiber Using Wavefront Shaping
Published on: March 20, 2017
Ji Yong Lee1, Tae-Jung Ahn, Sucbei Moon
1Department of Information and Communications, Gwangju Institute of Science and Technology, 1 Oryong-dong, Buk-gu, Gwangju 500-712, Korea. jylee@gist.ac.kr
Abstract:
We propose a novel mode analysis and differential mode delay measurement method for an optical fiber using Fourier-domain low-coherence interferometry. A spectral interferometer based on a Mach-Zehnder interferometer setup was used with a broadband source and an optical spectrum analyzer to detect relative temporal delays between the guided modes of a few-mode optical fiber by analyzing spectral interference signals. We have shown that experimental results of the proposed method agree well with those results obtained by using a conventional time-domain measurement method. We have demonstrated that this new mode analysis technique has high sensitivity (<60 dB) and very good resolution (<1 ps/m).
Related Concept Videos
Interference and Diffraction
Discrete-time Fourier transform
One of the notable...
Discrete Fourier Transform
Time and frequency -Domain Interpretation of Phase-lag Control
Phase-lag controllers do not place a pole at zero, but instead influence the steady-state error by amplifying any finite,...
Continuous -time Fourier Transform
Properties of Fourier Transform I
In radio broadcasting, multiple audio signals often need to be transmitted simultaneously. The Fourier...

