Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key aspect...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Design of Prismatic Beams for Bending01:23

Design of Prismatic Beams for Bending

The design of prismatic beams, structural elements with a uniform cross-section, focuses on ensuring safety and structural integrity under load. The design process begins by determining the allowable stress, either from material properties tables, or by dividing the material's ultimate strength by a safety factor. This safety factor is essential for accommodating uncertainties, and varies depending on the material—timber, steel, or concrete—with each having unique strength and stress...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

MRI safety considerations associated with low-field MRI: mostly good news.

Magma (New York, N.Y.)·2023
Same author

Safety Considerations of 7-T MRI in Clinical Practice.

Radiology·2019
Same author

Design standards for imaging spaces. Complying with new Joint Commission safety requirements.

Health facilities management·2016
Same author

Planning an MR suite: What can be done to enhance safety?

Journal of magnetic resonance imaging : JMRI·2015
Same author

Interrelating sentinel event alert #38 with the ACR guidance document on MR safe practices: 2013. An MRI accreditation safety review tool.

Journal of magnetic resonance imaging : JMRI·2013
Same author

Looking forward. FGI guidelines strive to advance imaging design.

Health facilities management·2010

Related Experiment Video

Updated: Jul 14, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014

Safety first: 'MR facility design guidelines' takes planners through the process

Tobias Gilk1

  • 1Junk Architects, Kansas City, MO, USA. tgilk@mri-planning.com

Health Facilities Management
|May 26, 2007
PubMed
Summary

No abstract available in PubMed .

Related Experiment Videos

Last Updated: Jul 14, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014