Off-design performance of power plants: an integrated gasification combined-cycle example
Abstract:
Fossil-fueled power plants typically operate below their design capacities for a large fraction of their service life. In the United States, increased fuel and capital costs attributable to this off-design operation are considerable. This article describes the reasons for off-design operation and its importance in designing and selecting new power plants. Recent studies of coal gasification combined-cycle power plants show how computer simulations of off-design performance can aid in the design process, and they suggest that such simulations can be useful in reducing the cost of building and operating new power plants.
Related Concept Videos
Turbine-Governor Control
Control of Power Flow
Otto and Diesel Cycle
Nuclear Power
Nuclear Fuels
Nuclear fuel consists of a fissile isotope, such as uranium-235, which must be present in sufficient quantity to provide a...
Internal Combustion Engine
Microbial Fuel Cells