Related Experiment Video
Updated: Jul 8, 2026

Comparison of Scale in a Photosynthetic Reactor System for Algal Remediation of Wastewater
Published on: March 6, 2017
A pilot-scale study of struvite precipitation in a stirred tank reactor: conditions influencing the process
1Departamento de Ingeniería Hidráulica y Medio Ambiente, Universidad Politécnica de Valencia, Camino de Vera s/n, 46022 Valencia, Spain.
Abstract:
Currently, the two most developed techniques for recovering phosphorus from wastewater consist of the formation of calcium phosphates and struvite (MgNH(4)PO(4).6H(2)O). In this work the influence of the operational conditions on the struvite precipitation process (pH in the reactor, hydraulic retention time, and magnesium:phosphorus, nitrogen:phosphorus, and calcium:magnesium molar ratios) have been studied. Twenty-three experiments with artificial wastewater were performed in a stirred reactor. In order to obtain the pH value maintenance during the crystallization process, a fuzzy logic control has been developed. High phosphorus removal efficiencies were reliably achieved precipitating the struvite as easily dried crystals or as pellets made up of agglomerated crystals.
More Related Videos
Related Concept Videos
Scale-Up Processes
Bioreactor Design and Operational System
Precipitation Processes
Bioreactor Controls-II
Bioreactor Controls-I
