On the sure criticality of tasks in activity networks with imprecise durations
S Chanas1, D Dubois, P Zielinski
1Inst. of Ind. Eng. & Manage., Wroclaw Univ. of Technol.
Abstract:
The notion of the necessary criticality (both with respect to path and to activity) of a network with imprecisely defined (by means of intervals or fuzzy intervals) activity duration times is introduced and analyzed. It is shown, in the interval case, that both the problem of asserting whether a given path is necessarily critical and the problem of determining an arbitrary necessarily critical path (more exactly, a subnetwork covering all the necessarily critical paths) are easy. The corresponding solution algorithms are proposed. However, the problem of evaluating whether a given activity is necessarily critical does not seem to be so easy. Certain conditions are formulated which, in some situations (but not in all possible situations), allow the necessary criticality of activities to be evaluated. The results obtained for networks with interval activity duration times are generalized to the case of networks with fuzzy activity duration times. Two effective algorithms for calculating the degree of necessary criticality of a fixed path, as well as an algorithm for determining the paths that are necessarily critical to the maximum degree, are proposed.
More Related Videos
09:43The 5-Choice Serial Reaction Time Task: A Task of Attention and Impulse Control for Rodents
Published on: August 10, 2014
09:01A Method for Investigating Age-related Differences in the Functional Connectivity of Cognitive Control Networks Associated with Dimensional Change Card Sort Performance
Published on: May 7, 2014
Related Concept Videos
Quantifying Work
The Availability Heuristic
Factors Affecting Activity Coefficient
The activity coefficient value for an ion is close to one when the solution has almost zero ionic strength, i.e., when the solution shows close to ideal behavior. As the ionic strength of the solution increases from 0 to 0.1 mol/L, a decrease in the...
Criteria for Causality: Bradford Hill Criteria - II
Reaction Mechanisms: Rate-limiting Step Approximation
Causality in Epidemiology