Related Experiment Video
Updated: Jul 5, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Upgrading of wastewater treatment plants for nutrient removal under optimal use of existing structures
S Winkler1, M Gasser, W Schättle
1Institute of Water Quality and Waste Management, Vienna University of Technology, A--1040 Vienna, Karlsplatz 13/E 226, Austria. swinkler@iwag.tuwien.ac.at
Abstract:
Upgrading of wastewater treatment plants under maximum use of existing structures is often an important requirement, but also useful due to a number of aspects. Because of a change in legal effluent requirements, a number of plants in Austria, typically aged 20+ years, were required to be extended. The two stage activated sludge HYBRID-process often provides an interesting design alternative for such plant upgrades, especially in case an anaerobic sludge treatment stage already exists. It provides high nutrient removal capacity at low area demand. The latter is especially important in cases where no or very limited extension area is available making it the key factor to preserve a site for future use. Based on two full stage case studies the adaptation of the plant layout, first operation results and a synthetic cost comparison to a conventional (single stage) plant extension are given.
More Related Videos
05:40Comparison of Scale in a Photosynthetic Reactor System for Algal Remediation of Wastewater
Published on: March 6, 2017
08:09Wastewater Irrigation Impacts on Soil Hydraulic Conductivity: Coupled Field Sampling and Laboratory Determination of Saturated Hydraulic Conductivity
Published on: August 19, 2018
Related Concept Videos
Microbial Wastewater Treatment
Biological Treatment of Effluent and Waste Water
Bioreactor Design and Operational System
Environmental Applications of Microorganisms
Bioremediation
Bioreactor Controls-III