Related Experiment Video

Updated: Jul 4, 2026

Procedure for Lung Engineering
12:50

Procedure for Lung Engineering

Published on: March 8, 2011

Engineers' register to ensure high standards

Bill Millar1

  • 1United Lincolnshire Hospitals.

Health Estate
|June 17, 2008
PubMed
Summary

The Authorising Engineer (AE) Medical Gas Pipeline Systems (MGPS) Register is being established to enhance safety and compliance. This initiative by the Institute of Healthcare Engineering and Estate Management (IHEEM) aims to improve standards in healthcare facilities.

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Quality of Water01:19

Quality of Water

In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Units of Measurement01:27

Units of Measurement

Mechanical engineering is one of the oldest branches of engineering. It deals with designing, analyzing, and manufacturing machines and mechanical systems. To ensure precise and accurate calculations, units of measurement are used. They provide a standard system for expressing and comparing physical quantities.
There are various well-known historical measurement systems, such as the Babylonian system, the Roman system, the Egyptian system, the Olympian system, the British system, and the Indus...
Weir01:24

Weir

A weir is a hydraulic structure designed to partially obstruct an open channel, enabling precise control and measurement of water flow. By forcing water to flow over or through it, a weir allows for accurate determination of discharge rates, making it an essential tool in water resource management. These structures are extensively used in regulating river flows, irrigation systems, and flood control channels.Types of Weirs and Their FeaturesWeirs are categorized primarily into sharp-crested and...
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...