Choosing a sustainable demolition waste management strategy using multicriteria decision analysis

Nicolas Roussat1, Christiane Dujet, Jacques Méhu

  • 1LGCIE, INSA-Lyon, 20 Avenue Albert Einstein, 69621 Villeurbanne Cedex, France. nicolas.roussat@insa-lyon.fr

Related Concept Videos

Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Decision Making: P-value Method01:09

Decision Making: P-value Method

The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim  is also stated. These statements can act as null and alternative hypotheses:  a null hypothesis would be a neutral statement while the alternative hypothesis can have a...
Design Example: Aggregate Gradation01:24

Design Example: Aggregate Gradation

The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is sampled...
Decision Making: Traditional Method01:14

Decision Making: Traditional Method

The process of hypothesis testing based on the traditional method includes calculating the critical value, testing the value of the test statistic using the sample data, and interpreting these values.
First, a specific claim about the population parameter is decided based on the research question and is stated in a simple form. Further, an opposing statement to this claim is also stated. These statements can act as null and alternative hypotheses, out of which a null hypothesis would be a...
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key aspect...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...