Related Experiment Video
Updated: Jul 3, 2026

Motion-Acuity Test for Visual Field Acuity Measurement with Motion-Defined Shapes
Published on: February 23, 2024
Image signal-to-noise ratio estimation using Shape-Preserving Piecewise Cubic Hermite Autoregressive Moving Average
1Faculty of Engineering and Technology, Multimedia University, Melaka, Malaysia. kssim@mmu.edu.my
Abstract:
We propose to cascade the Shape-Preserving Piecewise Cubic Hermite model with the Autoregressive Moving Average (ARMA) interpolator; we call this technique the Shape-Preserving Piecewise Cubic Hermite Autoregressive Moving Average (SP2CHARMA) model. In a few test cases involving different images, this model is found to deliver an optimum solution for signal to noise ratio (SNR) estimation problems under different noise environments. The performance of the proposed estimator is compared with two existing methods: the autoregressive-based and autoregressive moving average estimators. Being more robust with noise, the SP2CHARMA estimator has efficiency that is significantly greater than those of the two methods.
Related Concept Videos
Reconstruction of Signal using Interpolation
Linear Approximation in Frequency Domain
In contrast, nonlinear systems do not inherently possess these properties. However, for small deviations around an operating point, a nonlinear system can often be approximated as linear.
Root Mean Square
For example, consider the velocity of gas molecules in a container. The gas molecules are moving in different directions, which might impart positive and negative...
Linear Approximation in Time Domain
For a simple pendulum with a mass evenly distributed along its length and the center of mass located at half the pendulum's length, the...
One-Compartment Open Model: Wagner-Nelson and Loo Riegelman Method for ka Estimation
On...
Residuals and Least-Squares Property
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...