Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Planning Nursing Care I01:21

Planning Nursing Care I

The planning phase of the nursing process helps nurses set priorities, outline patient-centered goals and expected outcomes, and tailor nursing interventions to align with the aligned care plan. Through the planning phase, the nurse applies critical thinking skills to align and develop interventions according to the patient's needs. It provides continuity of care allowing patients to receive the maximum benefit from treatment. It serves as a pilot plan for allocating individual staff to a...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Field Procedure for Staking Out Curves01:26

Field Procedure for Staking Out Curves

Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the Point...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

Take the initiative to reduce surgical site infections.

Nursing·2018
Same author

Walk patients through total hip arthroplasty.

Nursing·2018
Same author

Providing evidence-based practices for patients with hip fractures.

Nursing·2018
Same author

Keeping children with latex allergies safe.

Nursing·2017
Same author

Total knee arthroplasty: past successes and current improvements.

AORN journal·2008
Same author

Looking into minimally invasive total hip arthroplasty.

Nursing·2005

Related Experiment Video

Updated: Jun 27, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014

OR construction project: from planning to execution.

Dorothea J Worley1, Sharon E Hohler

  • 1Saint Francis Medical Center, Cape Girardeau, MO, USA.

AORN Journal
|December 5, 2008
PubMed
Summary
This summary is machine-generated.

Planning and collaboration are key for successful operating room (OR) renovation projects. This case study details a multiphase OR renovation, offering insights for future facility upgrades.

More Related Videos

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
08:25

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

Published on: April 11, 2018

Related Experiment Videos

Last Updated: Jun 27, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
08:25

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

Published on: April 11, 2018

Area of Science:

  • Healthcare Facility Design
  • Surgical Suite Engineering

Background:

  • Operating room (OR) renovations are complex projects requiring meticulous planning.
  • Effective collaboration among surgeons, hospital staff, and vendors is crucial for success.

Purpose of the Study:

  • To provide a detailed account of a multiphase OR renovation project.
  • To offer practical information and tools for facilities undertaking similar renovations.

Main Methods:

  • A multiphase renovation project was undertaken at Saint Francis Medical Center.
  • Key considerations included electrical infrastructure and technology integration.

Main Results:

  • The project involved detailed planning for elements such as electrical outlet placement.
  • Integration of advanced technologies was a significant aspect of the renovation.

Conclusions:

  • The Saint Francis Medical Center OR renovation serves as a valuable case study.
  • Facilities planning OR renovations can utilize the provided information and tools for successful project execution.