Related Experiment Video
Updated: Jun 16, 2026

Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street
Published on: January 20, 2023
Comprehensive approach for the development of traffic noise prediction model for Jaipur city
1Civil Engineering Department, Malaviya National Institute of Technology JLN Marg, Jaipur, Rajasthan, 302017, India. agarwal.shetal@gmail.com
Abstract:
The main objective of the present study was to develop an empirical noise prediction model for the evaluation of equivalent noise level (Leq) in terms of equivalent traffic density number under heterogeneous traffic flow conditions. Ten commercial road networks are selected for monitoring and modeling. A new factor, i.e., equivalent number of light vehicles (EqLv) and for heavy vehicles (EqHv), has been used for evaluating the equivalent traffic density for each class of vehicles, and correlation graphs are plotted between equivalent traffic density with respect to EqLv and EqHv and observed equivalent noise level [Leq(o)] for the calculation of equivalent noise levels in terms of light vehicles [Leq(Lv)] and heavy vehicles [Leq(Hv)] for different identified locations as well as for the entire city. Furthermore, regression noise prediction equations have been developed between Leq(o), Leq(Lv), and Leq(Hv). After comparison of the results, it can be depicted that the light motor vehicles are the main source of noise pollution in the city and gives significantly higher correlation coefficient values. This model can be applied for the calculation of road traffic noise under interrupted traffic flow conditions in urban areas of Indian cities.
Related Concept Videos
Response Surface Methodology
The process of RSM involves several key steps:
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Linear Approximations
Classification of Signals
A continuous-time signal holds a value at every instant in time, representing information seamlessly. In contrast, a discrete-time signal holds values only at specific moments, often denoted as x(n), where...
Effects of Air-entrainment in Concrete
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
The...
