Related Experiment Video
Updated: Jun 12, 2026

08:15
3D Planning and Printing of Patient Specific Implants for Reconstruction of Bony Defects
Published on: August 4, 2020
Estates. Will building plans stay on the drawing board?
The Health Service Journal
|June 26, 2010
Summary
No abstract available in PubMed .
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Field Procedure for Staking Out Curves
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the Point...
Design Example: Sustainability in Concrete Building
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Mortar Properties
Mortar properties encompass a range of characteristics crucial for construction and masonry work, including workability, water retention, bond strength, durability, compressive strength, volume change, and appearance. Workability refers to mortar's ability to be easily applied and manipulated without sagging or falling off surfaces, which is important for efficient masonry unit placement and alignment. Water retention is essential to prevent the mortar from losing moisture too quickly to the...
Movement Joints in Buildings
Movement joints in buildings are essential design elements that accommodate inevitable motions caused by various factors such as temperature changes, moisture content variations, and structural deflections. These motions, if not considered in design and construction, can lead to unsightly or dangerous damage. Movement joints are incorporated in different forms to manage these stresses and allow materials to move without causing distress.
The simplest type of movement joints, working joints, are...
The simplest type of movement joints, working joints, are...

