[Clinical characteristics of patients with infection due to Influenza A (H1N1) 2009 and critical pathology]

J L Pérez Navero1, J Rumbao Aguirre, A Correas Sánchez

  • 1Intensivos Pediátricos, Unidad de Gestión Clínica de Pediatría y sus Especialidades, Hospital Universitario Reina Sofia, Córdoba, Spain. ucip.hrs.sspa@juntadeandalucia.es

Insights

Children with risk factors face a higher risk of severe outcomes from Influenza A (H1N1), particularly those needing intensive care. Monitoring RT-PCR for Influenza A (H1N1) can guide isolation duration.

Area of Science:

  • Pediatric Infectious Diseases
  • Virology
  • Critical Care Medicine

Context:

  • Influenza A (H1N1) caused significant pediatric hospitalizations during the 2009-2010 season.
  • Intensive therapy was required for a subset of these hospitalized children.

Purpose:

  • To analyze risk factors, clinical presentation, and outcomes of children hospitalized with Influenza A (H1N1).
  • To compare critically ill children (Group I) with non-critically ill hospitalized children (Group II).

Summary:

  • The study included 38 children, with 6 requiring intensive care. Critically ill patients had a higher prevalence of risk factors and respiratory symptoms.
  • Complications included ARDS, myocarditis requiring ECMO, and multi-organ dysfunction. Mortality was higher in the intensive care group.
  • Oseltamivir treatment duration and RT-PCR negativity time were longer in critically ill patients.

Impact:

  • Identifies risk factors associated with severe Influenza A (H1N1) in children.
  • Highlights the increased mortality and complications in critically ill pediatric patients.
  • Suggests RT-PCR monitoring can inform isolation protocols for Influenza A (H1N1).
Abstract

Related Concept Videos

Influenza01:27

Influenza

Influenza is an acute, highly communicable viral disease that affects the respiratory tract and is responsible for seasonal epidemics worldwide. Influenza A is the most prevalent type associated with widespread outbreaks and is subtyped based on two surface glycoproteins: hemagglutinin (H) and neuraminidase (N), as in H1N1. These glycoproteins are essential for viral infectivity, transmission, and immune recognition. Transmission occurs primarily through respiratory droplets and contaminated...
Pneumonia II: Pathophysiology01:29

Pneumonia II: Pathophysiology

The pathophysiology of pneumonia involves the following steps:
Stages of Infection01:26

Stages of Infection

Stages of infection describe what happens to a susceptible host once a pathogen invades the human body. The stages of infection are incubation, prodromal, illness, stage of decline, and convalescence. The incubation stage is the period from exposure to a pathogen until symptoms start. The infected person is unaware of impending illness as the pathogens grow and multiply within the body. The duration may vary depending on the type of infection. The incubation period of measles averages ten to...
Atypical Pneumonia01:14

Atypical Pneumonia

Atypical pneumonia, often caused by Mycoplasma pneumoniae, is a form of pulmonary infection that differs from the classical presentation of bacterial pneumonia in both its cause and clinical symptoms. Mycoplasma pneumoniae is a pleomorphic bacterium notable for its lack of a rigid cell wall. This structural characteristic imparts resistance to beta-lactam antibiotics and significantly influences the bacterium’s behavior within the human host.Other pathogens responsible for the disease include...
Pneumonia III: Complications and Assessment01:30

Pneumonia III: Complications and Assessment

Pneumonia poses the potential for numerous complications that warrant consideration. These complications include the following:
Endocarditis II: Clinical Features of Infective Endocarditis01:25

Endocarditis II: Clinical Features of Infective Endocarditis

Endocarditis can present various clinical features depending on the causative organism and the patient's underlying health conditions. Initially, the clinical features of infective endocarditis develop gradually, presenting with nonspecific symptoms that can be easily mistaken for other illnesses.General SymptomsEarly symptoms of infective endocarditis are fever, chills, weakness, malaise, fatigue, and weight loss. These symptoms reflect the systemic nature of the infection and the body's...