Related Experiment Video
Updated: Jun 5, 2026

Continuously-stirred Anaerobic Digester to Convert Organic Wastes into Biogas: System Setup and Basic Operation
Published on: July 13, 2012
Effect of operational cycle time length on nitrogen removal in an alternating oxidation ditch system
I D Mantziaras1, A Stamou, A Katsiri
1School of Civil Engineering, Department of Water Resources and Environmental Engineering, National Technical University of Athens, Iroon Polytechniou 5, Zografou, 15773, Athens, Greece. johnman@central.ntua.gr
Abstract:
This paper refers to nitrogen removal optimization of an alternating oxidation ditch system through the use of a mathematical model and pilot testing. The pilot system where measurements have been made has a total volume of 120 m(3) and consists of two ditches operating in four phases during one cycle and performs carbon oxidation, nitrification, denitrification and settling. The mathematical model consists of one-dimensional mass balance (convection-dispersion) equations based on the IAWPRC ASM 1 model. After the calibration and verification of the model, simulation system performance was made. Optimization is achieved by testing operational cycles and phases with different time lengths. The limits of EU directive 91/271 for nitrogen removal have been used for comparison. The findings show that operational cycles with smaller time lengths can achieve higher nitrogen removals and that an "equilibrium" between phase time percentages in the whole cycle, for a given inflow, must be achieved.
Related Concept Videos
Microbes and the Nitrogen Cycle
Microbial Wastewater Treatment
Bioreactor Design and Operational System
Biological Treatment of Effluent and Waste Water
The Nitrogen Cycle
Metabolism of Chemolithotrophs

