Methodology for the regulation of boom sprayers operating in circular trajectories

Francisco Javier Garcia-Ramos1, Mariano Vidal, Antonio Boné

  • 1Superior Polytechnic School, University of Zaragoza, Zaragoza, Spain. fjavier@unizar.es

Related Concept Videos

Pipe Flowrate Measurement: Problem Solving01:28

Pipe Flowrate Measurement: Problem Solving

A spray tank system is engineered to uniformly distribute a pest-control liquid across plants by using a pressurized mechanism. The tank, pressurized to 150 kPa, holds the pesticide at a height of 0.80 meters. Liquid flows from the tank through a 1.9 meter pipe with a diameter of 0.015 meters, angled at 0.698 radians, ultimately reaching a 0.007 meter nozzle that sprays the pesticide. Accurate calculation of the system's flow rate is crucial to ensure uniform application, and this is achieved...
Conservation of Mass in Moving, Nondeforming Control Volume01:14

Conservation of Mass in Moving, Nondeforming Control Volume

Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Relative Motion Analysis using Rotating Axes-Problem Solving01:29

Relative Motion Analysis using Rotating Axes-Problem Solving

Consider a crane whose telescopic boom rotates with an angular velocity of 0.04 rad/s and angular acceleration of 0.02 rad/s2. Along with the rotation, the boom also extends linearly with a uniform speed of 5 m/s. The extension of the boom is measured at point D, which is measured with respect to the fixed point C on the other end of the boom. For the given instant, the distance between points C and D is 60 meters.
Here, in order to determine the magnitude of velocity and acceleration for point...
Applications of Stress01:04

Applications of Stress

Consider a structure made of a boom and a rod designed to support a load. These two components are connected by a pin and stabilized by brackets and pins. The boom and the rod are detached from their supports to assess the different stresses imposed on this structure, and a free-body diagram is drawn. Then, all the forces applied, including the load acting on the structure, are identified. The reaction forces exerted on both the boom and the rod are computed using the equilibrium equations.
The...