Planning, designing, operating, and regulating a geologic sequestration repository as an underground landfill--a

Christopher J Brown1, Brandon Poiencot, Charles Sornberger

  • 1Department of Civil Engineering, University of North Florida, Jacksonville, 32225, USA. Christopher.j.brown@unf.edu

Related Concept Videos

Microbial Bioremediation of Uranium01:25

Microbial Bioremediation of Uranium

Microorganisms play a critical role in the transformation and immobilization of uranium in contaminated environments through four main pathways: bioreduction, biosorption, bioaccumulation, and biomineralization. These mechanisms reduce uranium’s toxicity and prevent its migration through groundwater systems, offering sustainable approaches for in situ bioremediation.Bioreduction of UraniumBioreduction is driven by anaerobic bacteria such as certain strains of Geobacter and Shewanella, which use...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Microbial Leaching01:27

Microbial Leaching

Microbial leaching, also known as bioleaching, is an environmentally favorable method for extracting metals from low-grade ores using specific microorganisms. This biotechnological approach is particularly valuable for mining operations targeting copper, gold, and uranium, where traditional extraction methods may be economically or environmentally impractical.Copper Leaching and Microbial CatalysisIn copper bioleaching, crushed ore is arranged into heaps and irrigated with a dilute sulfuric...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...