Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Stone Masonry01:29

Stone Masonry

Stone masonry is a construction technique that uses individual stones to build structures and can be categorized into two main types: rubble and ashlar. Rubble masonry uses uneven, naturally shaped stones such as river rocks or fragments from quarries. This method often requires the mason to select and possibly shape each stone to fit the designated space, ensuring a proper build, even with irregular stone sizes and shapes. Ashlar masonry, on the other hand, employs uniformly cut stones that...
Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the instrument's...
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
Elevation of Intermediate Points on Vertical Curves01:20

Elevation of Intermediate Points on Vertical Curves

Vertical curves are essential in roadway design because they provide smooth transitions between varying roadway grades. Designing vertical curves involves calculating intermediate elevations and identifying the curve's highest or lowest point, which is essential for optimal roadway performance.Intermediate elevations on a vertical curve are determined using the tangent offset method. This method considers the initial elevation at the start of the curve, the grades, and the curve's geometry. The...