Hazard awareness of construction site dumper drivers

Jonathan Bohm1, Don Harris

  • 1Health and Safety Executive, UK.

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Hazard Rate01:11

Hazard Rate

The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
Pumped Concrete01:13

Pumped Concrete

Concrete in large quantities can be pumped across long distances for placing in inaccessible sites. This system comprises a hopper that receives concrete from a mixer, a pump to propel the concrete, and pipelines that facilitate its delivery.
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...