Background:
The Golden Gate Bridge (GGB) is a well-known "suicide magnet" and the site of approximately 30 suicides per year. Recently, a suicide barrier was approved to prevent further suicides.
Aims:
To estimate the cost-effectiveness of the proposed suicide barrier, we compared the proposed costs of the barrier over a 20-year period ($51.6 million) to estimated reductions in mortality.
Method:
We reviewed San Francisco and Golden Gate Bridge suicides over a 70-year period (1936-2006). We assumed that all suicides prevented by the barrier would attempt suicide with alternative methods and estimated the mortality reduction based on the difference in lethality between GGB jumps and other suicide methods. Cost/benefit analyses utilized estimates of value of statistical life (VSL) used in highway projects.
Results:
GGB suicides occur at a rate of approximately 30 per year, with a lethality of 98%. Jumping from other structures has an average lethality of 47%. Assuming that unsuccessful suicides eventually committed suicide at previously reported (12-13%) rates, approximately 286 lives would be saved over a 20-year period at an average cost/life of approximately $180,419 i.e., roughly 6% of US Department of Transportation minimal VSL estimate ($3.2 million).
Conclusions:
Cost-benefit analysis suggests that a suicide barrier on the GGB would result in a highly cost-effective reduction in suicide mortality in the San Francisco Bay Area.
Related Concept Videos
Framing Effects
Thermal expansion and Thermal stress: Problem Solving
To solve the problem, first, identify the known and unknown quantities. The initial length (L) of the bridge is 1275 m, the coefficient of linear expansion (α) for steel is 12 x 10-6/°C, and the change in temperature (ΔT) is 55 °C.
Design Consideration
The factor of safety is another key aspect...
Cable Subjected to a Distributed Load
Bystander Effect
The Stanford Prison Experiment