Related Experiment Video
Updated: May 13, 2026

MicroRNA Detection in Prostate Tumors by Quantitative Real-time PCR (qPCR)
Published on: May 16, 2012
Identification of novel AR-targeted microRNAs mediating androgen signalling through critical pathways to regulate
Wenjuan Mo1, Jiyuan Zhang, Xia Li
1State Key Laboratory of Genetic Engineering, Institute of Genetics, School of Life Science, Fudan University, Shanghai, China.
Abstract:
MicroRNAs (miRNAs) have been recognized as significantly involved in prostate cancer (PCa). Since androgen receptor (AR) plays a central role in PCa carcinogenesis and progression, it is imperative to systematically elucidate the causal association between AR and miRNAs, focusing on the molecular mechanisms by which miRNAs mediate AR signalling. In this study, we performed a series of time-course microarrays to observe the dynamic genome-wide expressions of mRNAs and miRNAs in parallel in hormone-sensitive prostate cancer LNCaP cells stimulated by androgen. Accordingly, we introduced Response Score to identify AR target miRNAs, as well as Modulation Score to identify miRNA target mRNAs. Based on theoretical identification and experimental validation, novel mechanisms addressing cell viability in PCa were unravelled for 3 miRNAs newly recognized as AR targets. (1) miR-19a is directly up-regulated by AR, and represses SUZ12, RAB13, SC4MOL, PSAP and ABCA1, respectively. (2) miR-27a is directly up-regulated by AR, and represses ABCA1 and PDS5B. (3) miR-133b is directly up-regulated by AR, and represses CDC2L5, PTPRK, RB1CC1, and CPNE3, respectively. Moreover, we found miR-133b is essential to PCa cell survival. Our study gives certain clues on miRNAs mediated AR signalling to cell viability by influencing critical pathways, especially by breaking through androgen's growth restriction effect on normal prostate tissue.
Insights
This study reveals how androgen receptor (AR) directly regulates specific microRNAs (miRNAs) in prostate cancer (PCa). These miRNAs, including miR-133b, influence cancer cell survival by modulating AR signaling pathways.
Area of Science:
- Oncology
- Molecular Biology
- Genetics
Background:
- MicroRNAs (miRNAs) are implicated in prostate cancer (PCa) development and progression.
- The androgen receptor (AR) is a key driver in PCa, making its interaction with miRNAs crucial to understand.
- Systematic elucidation of AR-miRNA associations and their molecular mechanisms is needed.
Purpose of the Study:
- To investigate the dynamic genome-wide expression of mRNAs and miRNAs in response to androgen stimulation in PCa cells.
- To identify AR target miRNAs and miRNA target mRNAs using novel scoring systems.
- To uncover novel molecular mechanisms of AR-regulated miRNAs impacting PCa cell viability.
Main Methods:
- Time-course microarrays were used to analyze mRNA and miRNA expression in LNCaP cells stimulated by androgen.
- Response Score and Modulation Score were introduced to identify AR target miRNAs and miRNA target mRNAs, respectively.
- Experimental validation was performed to confirm identified mechanisms.
Main Results:
- Three novel AR target miRNAs (miR-19a, miR-27a, miR-133b) were identified.
- miR-19a, miR-27a, and miR-133b were found to be directly up-regulated by AR.
- These miRNAs repress various target genes, with miR-133b being essential for PCa cell survival and potentially overcoming androgen's growth restriction.
Conclusions:
- This study elucidates novel mechanisms of miRNA-mediated AR signaling in PCa cell viability.
- Identified miRNAs (miR-19a, miR-27a, miR-133b) represent potential therapeutic targets in prostate cancer.
- Understanding these pathways provides insights into overcoming androgen's role in PCa progression.
Related Concept Videos
MicroRNAs
MicroRNAs
mTOR Signaling and Cancer Progression
The mTOR pathway or the...
Abnormal Proliferation

