Extended risk-analysis model for activities of the project
Janez Kušar1, Lidija Rihar, Urban Zargi
1Faculty of Mechanical Engineering, Aškerčeva 6, SI-1000 Ljubljana, Slovenia.
Abstract:
Project management of product/service orders has become a mode of operation in many companies. Although these are mostly cyclically recurring projects, risk management is very important for them. An extended risk-analysis model for new product/service projects is presented in this paper. Emphasis is on a solution developed in the Faculty of Mechanical Engineering in Ljubljana, Slovenia. The usual project activities risk analysis is based on evaluation of the probability that risk events occur and on evaluation of their consequences. A third parameter has been added in our model: an estimate of the incidence of risk events. On the basis of the calculated activity risk level, a project team prepares preventive and corrective measures that should be taken according to the status indicators. An important advantage of the proposed solution is that the project manager and his team members are timely warned of risk events and they can thus activate the envisaged preventive and corrective measures as necessary.
Related Concept Videos
Types of Biopharmaceutical Studies: Controlled and Non-Controlled Approaches
Non-controlled studies, commonly employed for initial exploration, lack a control group, rendering them susceptible to biases and external influences. In contrast, controlled...
Assumptions of Survival Analysis
Actuarial Approach
Consider the example of a high-risk surgical procedure with significant early-stage mortality. A two-year clinical study is conducted,...
Introduction To Survival Analysis
The primary goal of survival analysis is to estimate survival time—the time until a...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Hazard Rate