Related Experiment Video
Updated: May 6, 2026

Experimental Column Setup for Studying Anaerobic Biogeochemical Interactions Between Iron OxyHydroxides, Trace Elements, and Bacteria
Published on: December 19, 2017
Laboratory-scale column study for remediation of TCE-contaminated aquifers using three-section controlled-release
Baoling Yuan1, Fei Li, Yanmei Chen
1Institute of Municipal and Environmental Engineering, College of Civil Engineering, Huaqiao University, Xiamen 361021, China. blyuan@hqu.edu.cn
Abstract:
A laboratory-scale study with a sand column was designed to simulate trichloroethylene (TCE) pollution in the aquifer environment with three-section controlled-release potassium permanganate (CRP) barriers. The main objective of this study was to evaluate the feasibility of CRP barriers in remediation of TCE in aquifers in a long-term and controlled manner. CRP particles with a 1:3 molar ratio of KMnO4 to stearic acid showed the best controlled-release properties in pure water, and the theoretical release time was 138.5 days. The results of TCE removal in the test column indicated that complete removal efficiency of TCE in a sand column by three-section CRP barriers could be reached within 15 days. The molar ratio of KMnO4 to TCE in the three-section CRP barriers was 16:1, which was much lower than 82:1 as required when KMnO4 solution is used directly to achieve complete destruction of TCE. This result revealed that the efficiency of CRP for remediation of TCE was highly improved after encapsulation.
Related Concept Videos
Bioremediation
Microbial Bioremediation of Uranium
Controlled-Potential Coulometry: Electrolytic Methods
The chosen potential...

