Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application
1State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610064, China ; Uncertainty Decision-Making Laboratory, Sichuan University, Chengdu 610064, China.
Abstract:
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
Related Concept Videos
Distributed Loads: Problem Solving
Fast Decoupled and DC Powerflow
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Load-frequency control
Multiple Pipe Systems
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment