Related Experiment Video
Updated: May 2, 2026

Preparing an Isotopically Pure 229Th Ion Beam for Studies of 229mTh
Published on: May 3, 2019
Implementation of an operator intervention system for remote control of the RIKEN 28 GHz superconducting electron
A Uchiyama1, K Furukawa2, Y Higurashi3
1The Graduate University for Advanced Studies, 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan.
Abstract:
The control system for the RIKEN 28 GHz superconducting electron cyclotron resonance ion source (28 GHz SC-ECRIS) consists of a distributed control system based on the experimental physics and industrial control system. To maintain the beam quality for the long beam-service time at the radioactive isotope beam factory, beam tuning to prevent subtle changes in the 28 GHz SC-ECRIS conditions is required. Once this is achieved, it should then be possible to check conditions and operate the ion source at any time. We have designed a web-based operational interface to remotely control the ion source, but for access and control from several locations, suitable access security, policies, and methods are required. We thus implemented an operator intervention system that makes it possible to safely access the network externally with the permission of on-site accelerator operators in the control room.
More Related Videos
07:24Quantitative Atomic-Site Analysis of Functional Dopants/Point Defects in Crystalline Materials by Electron-Channeling-Enhanced Microanalysis
Published on: May 10, 2021
13:41Magnetic Resonance-Guided High Intensity Focused Ultrasound Generated Hyperthermia: A Feasible Treatment Method in a Murine Rhabdomyosarcoma Model
Published on: January 13, 2023