Integrated project scheduling and staff assignment with controllable processing times
Victor Fernandez-Viagas1, Jose M Framinan1
1Industrial Management, School of Engineering, University of Seville, Camino de los Descubrimientos, s/n, 41092 Seville, Spain.
This study integrates project task scheduling and staff assignment, considering skill requirements and variable task durations. A novel integer programming model and a GRASP algorithm offer efficient solutions for complex service company operations.
Area of Science:
- Operations Research
- Management Science
- Computer Science
Background:
- Project management often involves complex interdependencies between task scheduling and staff allocation.
- Service companies face challenges in optimizing resource allocation due to skill-based task requirements and dynamic task durations.
Purpose of the Study:
- To develop an integrated model for simultaneously scheduling project tasks and assigning skilled personnel.
- To compare controllable processing times with fixed processing times in project management.
- To provide efficient approximate solutions for complex scheduling and assignment problems.
Main Methods:
- Formulation of an integer programming model for integrated task scheduling and staff assignment.
- Development of extensions to the model for diverse operational scenarios.
- Implementation of a Greedy Randomized Adaptive Search Procedure (GRASP) algorithm for approximate solutions.
Main Results:
- The proposed integer programming model effectively captures the complexities of simultaneous scheduling and assignment.
- Controllable processing times offer distinct advantages over fixed processing times in this context.
- The GRASP algorithm yields high-quality approximate solutions within practical time constraints.
Conclusions:
- The integrated approach provides a robust framework for optimizing project task scheduling and staff assignment in service industries.
- The study highlights the benefits of considering variable task durations and skill-based assignments.
- The GRASP algorithm serves as an effective heuristic for solving computationally intensive project management problems.
Related Concept Videos
Time and frequency -Domain Interpretation of Phase-lead Control
The design of phase-lead control involves the strategic placement of poles and zeros to balance steady-state error and system...
Upstream Processing
PI Controller: Design
Time and frequency -Domain Interpretation of PI Control
Acting as a low-pass filter, the PI controller slows the system's response and extends settling times. This requires...
Statically Indeterminate Problem Solving
Time-Domain Interpretation of PD Control
Consider the example of control of motor torque. Initially, a positive...