Cooperative fuzzy games approach to setting target levels of ECs in quality function deployment

Zhihui Yang1, Yizeng Chen2, Yunqiang Yin3

  • 1School of Management, Shanghai University, Shanghai 200444, China ; College of Sciences, East China Institute of Technology, Nanchang, Jiangxi 330013, China.

Related Concept Videos

Decision Making: P-value Method01:09

Decision Making: P-value Method

The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim  is also stated. These statements can act as null and alternative hypotheses:  a null hypothesis would be a neutral statement while the alternative hypothesis can...
5.8K
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
4.0K
Response Surface Methodology01:16

Response Surface Methodology

Response Surface Methodology (RSM) is a collection of statistical and mathematical techniques used to develop, improve, and optimize processes. It is particularly valuable when many input variables or factors potentially influence a response variable.
The process of RSM involves several key steps:
887
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
390
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
545
Quality Control01:05

Quality Control

Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
4.2K