Related Experiment Video
Updated: Mar 24, 2026

Lipidico Injection Protocol for Serial Crystallography Measurements at the Australian Synchrotron
Published on: September 23, 2020
Status of the SPIRAL2 injector commissioning
T Thuillier1, J Angot1, C Barué2
1LPSC, Université Grenoble Alpes, CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex, France.
Abstract:
The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.
Related Concept Videos
Gas Chromatography: Sample Injection Systems
Two primary injection methods are used...
Internal Combustion Engine
The Spindle Assembly Checkpoint
Many proteins function together to control the spindle assembly checkpoint. Mutations affecting these proteins may allow cells to proceed into anaphase prematurely, resulting in the...
The Spindle Assembly Checkpoint
Bioreactor Controls-II
Pilot and Numeric Relaying

