Hydropeaking mitigation project on a multi-purpose hydro-scheme on Valsura River in South Tyrol/Italy

Georg Premstaller1, Valentina Cavedon1, Giuseppe Roberto Pisaturo2

  • 1Department of Engineering & Consulting, Alperia Plc, Via Ressel 2, 39100, Bolzano, Italy.

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
347
Design Example: Creating a Hydraulic Model of a Dam Spillway01:21

Design Example: Creating a Hydraulic Model of a Dam Spillway

Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
847
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
995
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
502
Energy Line and Hydraulic Gradient Line01:27

Energy Line and Hydraulic Gradient Line

Based on Bernoulli's equation, the energy line (EL) and hydraulic grade line (HGL) provide graphical representations of energy distribution in a fluid flow system. For steady, incompressible, inviscid flows, Bernoulli's equation is expressed as:
2.7K
Regulation of Water Output01:26

Regulation of Water Output

The human body predominantly expels water through the urinary system. On average, an individual generates around 1.5 liters of urine each day. This amount can fluctuate based on how well a person is hydrated, but a critical minimum quantity of urine must be produced to ensure the body's proper functioning. Daily, the kidneys remove 600 to 1200 milliosmoles of dissolved substances, effectively excreting excess minerals and water-soluble toxins such as creatinine, urea, and uric acid from the...