Problem:
The close quartering and exposed living conditions in evacuation centres and the potential increase in vector density after flooding in Solomon Islands resulted in an increased risk of exposure for the occupants to vectorborne diseases.
Context:
In April 2014, Solomon Islands experienced a flash flooding event that affected many areas and displaced a large number of people. In the capital, Honiara, nearly 10 000 people were housed in emergency evacuation centres at the peak of the post-flood emergency. At the time of the floods, the number of dengue cases was increasing, following a record outbreak in 2013.
Action:
The National Vector Borne Disease Control Programme with the assistance of the World Health Organization implemented an emergency vector-control response plan to provide protection to the at-risk populations in the evacuation centres. The National Surveillance Unit also activated an early warning disease surveillance system to monitor communicable diseases, including dengue and malaria.
Outcome:
Timely and strategic application of the emergency interventions probably prevented an increase in dengue and malaria cases in the affected areas.
Discussion:
Rapid and appropriate precautionary vector-control measures applied in a post-natural disaster setting can prevent and mitigate vectorborne disease incidences. Collecting vector surveillance data allows better analysis of vector-control operations' effectiveness.
Related Concept Videos
Responses to Drought and Flooding
Applications of GIS: Disaster Management and Emergency Response
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Response Surface Methodology
The process of RSM involves several key steps:
Design Example: Creating a Hydraulic Model of a Dam Spillway
Hydraulic Jump: Problem Solving