Related Experiment Video
Updated: Mar 6, 2026

Experimental Manipulation of Body Size to Estimate Morphological Scaling Relationships in Drosophila
Published on: October 1, 2011
Effect of changes in resource level on age and size at metamorphosis in Hyla squirella
1Institute of Ecology, University of Georgia, Athens, GA 30602, USA Savannah River Ecology Laboratory, Drawer E, Aiken, SC 29801, USA e-mail: cbeck@uga.cc.uga.edu; fax: (706) 542-6040, , , , , , GE.
Abstract:
Recent experiments suggest that timing of metamorphosis is fixed during development in some anurans, insects, and freshwater invertebrates. Yet, these experiments do not exclude a growth rate optimization model for the timing of metamorphosis. I manipulated food resources available to larvae of squirrel treefrogs (Hyla squirella) to determine if there is a loss of plasticity in duration of larval period during development and to critically test growth rate models for the timing of metamorphosis. Size-specific resource levels for individual tadpoles were switched from low to high or high to low at three developmental stages spaced throughout larval development. The effects of changes in resource availability on larval period and mass at metamorphosis were measured. Switching food levels after late limb bud development did not significantly affect larval period in comparison to constant food level treatments. Therefore, developmental rate in H. squirella is better described by a fixed developmental rate model, rather than a growth rate optimization model. The timing of fixation of developmental rate in H. squirella is similar to that found in other anuran species, suggesting a taxonomically widespread developmental constraint on the plasticity of larval period duration. Mass at metamorphosis was not significantly affected by the timing of changes in food levels; the amount of food available later in development determined the size at metamorphosis. Larval period and mass at metamorphosis were negatively correlated in only one of two experiments, which contrasts with the common assumption of a phenotypic trade-off between decreased larval period and increased mass at metamorphosis.
Related Concept Videos
Speciation Rates
Background and Environment Affect Phenotype
An example of how genetic background affects phenotype can be seen in horses. The Extension gene in horses is responsible for their coat color. A wild-type gene (EE) produces black pigment in the coat, while a mutant gene (ee) produces red pigment. A...
Predator-Prey Interactions
Energy Budgets
Life Histories
Changes in the Appendicular Skeleton with Age
Initially, the limb buds consist of a core of mesenchyme covered by a layer of ectoderm. The ectoderm at the end of the limb bud thickens to form a narrow crest called the apical ectodermal ridge. This ridge stimulates the underlying...

