Related Experiment Video
Updated: Mar 3, 2026

Assessing Disaster Resilience of Concrete with Titanium Dioxide Nanoparticles
Published on: November 14, 2025
Engineering risk assessment for emergency disposal projects of sudden water pollution incidents
Bin Shi1, Jiping Jiang2, Rentao Liu1
1School of Municipal and Environment Engineering, Harbin Institute of Technology, Harbin, 150090, China.
Abstract:
Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Applications of GIS: Disaster Management and Emergency Response
Hazard Rate
Bioremediation
Pharmaceutical Poisoning: Potential Scenarios
Design Example: Creating a Hydraulic Model of a Dam Spillway

