Channel and Timeslot Co-Scheduling with Minimal Channel Switching for Data Aggregation in MWSNs

Sanggil Yeoum1, Byungseok Kang2, Jinkyu Lee3

  • 1College of Software, Sungkyunkwan University, Suwon 16419, Korea. sanggil12@skku.edu.

Related Concept Videos

Cable Subjected to a Distributed Load01:24

Cable Subjected to a Distributed Load

The analysis of suspension bridges is a complex and critical process that involves multiple factors, including the shape and tension of the main cables. The main cables of suspension bridges are subjected to distributed loads, which result in changes in tensile forces and deformation of the cable. These loads must be carefully considered to ensure that the bridge is safe and capable of supporting the weight of different loads.
1.2K
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
658
Multimachine Stability01:25

Multimachine Stability

Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
594
Cable Subjected to Concentrated Loads01:28

Cable Subjected to Concentrated Loads

Flexible cables are commonly used in various applications for support and load transmission. Consider a cable fixed at two points and subjected to multiple vertically concentrated loads. Determine the shape of the cable and the tension in each portion of the cable, given the horizontal distances between the loads and supports.
1.5K
Maximum Power Transfer01:16

Maximum Power Transfer

Numerous practical applications within engineering disciplines, such as telecommunications, necessitate optimizing power delivery to a connected load. This pursuit, however, entails inherent internal losses, which can either equal or exceed the power supplied to the load. The Thevenin equivalent circuit is helpful in finding the maximum power a linear circuit can deliver to a load. It is assumed in this context that the load resistance can be adjusted.
By substituting the entire circuit with...
1.0K
Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
674