Related Experiment Video
Updated: Mar 2, 2026

07:42
Quasistatic Mechanical Testing for Computer-Aided Design and Manufacturing Occlusal Veneers Cemented to Milled Dentin Analog Material
Published on: December 20, 2024
915
MO-A-213CD-01: CT QC Testing Under the Draft ACR QC Manual
1Boulder Community Foothills Hospital, Boulder, CO.
Medical Physics
|May 19, 2017
Summary
Quality control for computed tomography (CT) scanners has many recommendations, causing confusion. The American College of Radiology (ACR) is finalizing a CT Quality Control Manual to clarify necessary procedures.
Area of Science:
- Medical Imaging Physics
- Radiology Quality Assurance
Background:
- Numerous quality control (QC) recommendations exist for computed tomography (CT) scanners.
- The wide range of guidelines has created confusion regarding essential QC practices.
Purpose of the Study:
- To review existing CT quality control recommendations.
- To outline the draft QC program within the American College of Radiology (ACR) CT QC Manual.
- To discuss the current status of the ACR CT QC Manual.
Main Methods:
- Literature review of current CT QC recommendations.
- Description of the proposed QC protocols in the draft ACR CT QC Manual.
- Assessment of the development stage of the ACR CT QC Manual.
Main Results:
- Current CT QC recommendations are extensive and varied.
- The draft ACR CT QC Manual aims to standardize necessary QC procedures.
- The ACR CT QC Manual is nearing completion and final review.
Conclusions:
- A unified approach to CT quality control is needed.
- The forthcoming ACR CT QC Manual will provide essential guidance for CT scanner QC.
- Standardized QC will improve the reliability and safety of CT imaging.
Related Concept Videos
Quality Control
4.1K
Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
4.1K
Quality Assurance
3.7K
Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
3.7K
Testing Water Quality
425
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
425
Cochran's Q Test
1.0K
Cochran's Q Test is a nonparametric statistical test used to determine if there are potential differences in the outcomes of three or more related groups on a binary (yes/no) or dichotomous outcome. It is essentially an extension of the McNemar Test, which is limited to two related samples - Cochran's Q test can handle three or more related samples, making it more versatile in scenarios where subjects are measured under multiple conditions. The test statistic follows a Chi-Square...
1.0K
Design Example: Managing Concrete Workability
319
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
319
Slump Test
1.0K
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
1.0K

