Related Experiment Video
Updated: Mar 1, 2026

Author Spotlight: 3D Movement Assessment of Maxillary Posterior Teeth in Clear Aligner Treatment
Published on: February 23, 2024
Predictable prosthetic space maintenance during staged complete-mouth rehabilitation
Abdulaziz AlHelal1, Sarah Bukhari2, Mathew T Kattadiyil3
1Faculty, Department of Prosthetic Dental Sciences, College of Dentistry, King Saud University, Riyadh, Saudi Arabia.
This study presents a staged complete-mouth rehabilitation approach using a clear acrylic resin space maintainer in a maxillary fixed complete denture (FCD). This method successfully prevented complications and allowed for future prosthetic restoration, accommodating financial constraints.
Area of Science:
- Dental prosthetics
- Oral rehabilitation
- Maxillofacial reconstruction
Background:
- Complete-mouth rehabilitation often faces challenges due to patient financial constraints.
- Staged treatment approaches are necessary to manage long-term dental care affordability.
- Maintaining prosthetic space is crucial during phased treatment to prevent complications.
Observation:
- A clear acrylic resin was added to the anterior cameo surface of a maxillary fixed complete denture (FCD).
- This addition served as an effective space maintainer during a staged rehabilitation process.
- The space maintainer successfully prevented supraeruption of mandibular anterior teeth and prosthetic space encroachment.
Findings:
- The staged approach allowed for the restoration of the maxillary FCD, addressing the patient's chief complaint.
- The space maintainer prevented potential complications, avoiding the need for additional treatment.
- Subsequent mandibular rehabilitation with zirconia restorations transitioned smoothly after simple removal of the space maintainer.
Implications:
- This technique offers a viable financial solution for patients undergoing complete-mouth rehabilitation.
- Staged treatment with interim space maintainers ensures treatment continuity and prevents secondary complications.
- The described method facilitates predictable and efficient full-mouth reconstruction, even with treatment delays.
More Related Videos
07:42Quasistatic Mechanical Testing for Computer-Aided Design and Manufacturing Occlusal Veneers Cemented to Milled Dentin Analog Material
Published on: December 20, 2024
09:10Digital Hybrid Model Preparation for Virtual Planning of Reconstructive Dentoalveolar Surgical Procedures
Published on: August 5, 2021