Related Experiment Video
Updated: Feb 25, 2026

Continuous Hydrologic and Water Quality Monitoring of Vernal Ponds
Published on: November 13, 2017
A Bayesian maximum entropy-based methodology for optimal spatiotemporal design of groundwater monitoring networks
Marjan Hosseini1, Reza Kerachian2
1School of Civil Engineering, College of Engineering, University of Tehran, Tehran, Iran.
Abstract:
This paper presents a new methodology for analyzing the spatiotemporal variability of water table levels and redesigning a groundwater level monitoring network (GLMN) using the Bayesian Maximum Entropy (BME) technique and a multi-criteria decision-making approach based on ordered weighted averaging (OWA). The spatial sampling is determined using a hexagonal gridding pattern and a new method, which is proposed to assign a removal priority number to each pre-existing station. To design temporal sampling, a new approach is also applied to consider uncertainty caused by lack of information. In this approach, different time lag values are tested by regarding another source of information, which is simulation result of a numerical groundwater flow model. Furthermore, to incorporate the existing uncertainties in available monitoring data, the flexibility of the BME interpolation technique is taken into account in applying soft data and improving the accuracy of the calculations. To examine the methodology, it is applied to the Dehgolan plain in northwestern Iran. Based on the results, a configuration of 33 monitoring stations for a regular hexagonal grid of side length 3600 m is proposed, in which the time lag between samples is equal to 5 weeks. Since the variance estimation errors of the BME method are almost identical for redesigned and existing networks, the redesigned monitoring network is more cost-effective and efficient than the existing monitoring network with 52 stations and monthly sampling frequency.
Related Concept Videos
Mechanistic Models: Compartment Models in Individual and Population Analysis
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

