Related Experiment Video
Updated: Feb 16, 2026

Author Spotlight: Establishing a Murine Non-Small Cell Lung Cancer Model for Developing Nanoformulations of Anticancer Drugs
Published on: May 10, 2024
Proinflammatory B-cell profile in the early phases of MS predicts an active disease
Thomas Guerrier1, Myriam Labalette1, David Launay1
1Université de Lille, CHU Lille, LIRIC-INSERM U 995, FHU Imminent, France.
Objective:
To assess whether any alteration of B-cell subset distribution and/or the cytokine production capacities of B cells could be associated with any stage of MS and could be predictive of MS evolution.
Methods:
We prospectively enrolled radiologically isolated syndrome (RIS), clinically isolated syndrome (CIS), naive patients with relapsing remitting MS (RRMS) of any disease modifying drug, and healthy controls (HCs). Peripheral blood B-cell subset distributions and the interleukin (IL)-6/IL-10-producing B-cell ratio were assessed by flow cytometry to evaluate their proinflammatory and anti-inflammatory functional properties.
Results:
Twelve RIS, 46 CIS, 31 RRMS patients, and 36 HCs were enrolled. We observed that a high IL-6/IL-10-producing B-cell ratio in patients with RIS/CIS was associated with the evolution of the disease in the short term (6 months). This imbalance in cytokine production was mainly explained by an alteration of the production of IL-10 by B cells, especially for the transitional B-cell subset. In addition, a significant increase in IgD-/CD27- B cells was detected in patients with CIS and RRMS compared with HCs (p = 0.01). Apart from this increase in exhausted B cells, no other variation in B-cell subsets was observed.
Conclusions:
The association between a high IL-6/IL-10-producing B-cell ratio and the evolution of patients with RIS/CIS suggest a skew of B cells toward proinflammatory properties that might be implicated in the early phases of MS disease.
More Related Videos
Related Concept Videos
Predicting Molecular Geometry
Phase Diagrams
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Phase Transitions
Sensitivity, Specificity, and Predicted Value
Sensitivity is the...
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...

