Quality of fresh-cut products as affected by harvest and postharvest operations

Francisca A Ansah1, Maria L Amodio1, Giancarlo Colelli1

  • 1Università di Foggia, Dipartimento di Scienze Agrarie, degli alimenti e dell'Ambiente, Foggia, Italy.

Related Concept Videos

Segregation in Fresh Concrete01:16

Segregation in Fresh Concrete

Segregation in fresh concrete is a phenomenon where the components of the concrete mix separate, leading to uneven distribution and compromised structural integrity. This separation typically occurs when concrete is subjected to excessive horizontal movement within forms, or when it is dropped from considerable heights or forced through narrow, winding paths. As a result, heavier coarse aggregate particles settle at the bottom, while lighter, finer materials such as cement and water rise to the...
627
Cut-off Frequency of BJT01:17

Cut-off Frequency of BJT

Cut-off frequencies in Bipolar Junction Transistors (BJTs) mark the transition between the signal's pass band and stop band, influencing their performance in amplifying or attenuating frequencies. These frequencies are crucial for designing BJTs to meet specific operational requirements in electronic circuits.
Alpha Cut-Off Frequency: Pertinent to the common-base configuration, the alpha cut-off frequency defines the upper-frequency limit at which the current gain, alpha, remains stable. As...
1.4K
Brick Cutting Techniques01:08

Brick Cutting Techniques

Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
690
Bleeding in Fresh Concrete01:22

Bleeding in Fresh Concrete

Bleeding in fresh concrete occurs when water from the mix rises to the surface. This happens because the mix's solid components fail to retain all the water as they settle, leading to separation where water collects at the top. The severity of bleeding can be measured by assessing the total settlement or by noting the decrease in height per unit height of concrete.
Bleeding can cause several issues in the concrete structure. Sometimes, the rising water gets trapped beneath large aggregate...
625
Real Number Operations01:27

Real Number Operations

The concept of real numbers includes all the values that can be represented on a continuous number line. The system began with basic counting values used for enumeration. It later expanded to include values that represent the absence of quantity and opposites of the counting values. When situations required expressing parts of a whole or dividing quantities evenly, values capable of representing such proportions were developed. When written using decimal notation, these values can end or repeat...
349
Operational Amplifiers01:17

Operational Amplifiers

The operational amplifier, often referred to as an op-amp, is a multifaceted building block of a circuit. This electronic component functions like a voltage-controlled voltage source and can also be used to create a voltage- or current-controlled current source. The design of an operational amplifier enables it to execute mathematical operations when external components like resistors and capacitors are linked to its terminals. An op-amp has the capacity to sum signals, amplify a signal,...
2.0K