Burning intensity and low light availability reduce resprouting ability and vigor of Buxus sempervirens L. after

P Casals1, A I Rios1

  • 1Forest Sciences Centre of Catalonia, CTFC, Ctra de St. Llorenç de Morunys, km 2, 25280 Solsona, Spain.

Related Concept Videos

The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
7.1K
Burn Injuries01:22

Burn Injuries

Burn injuries occur when the skin and underlying tissues are damaged due to exposure to heat, electricity, chemicals, radiation, or friction. They can vary in severity, from minor superficial burns to severe deep burns that can be life-threatening.
The damage results in the death of skin cells, which can lead to a massive loss of fluid. Dehydration, electrolyte imbalance, and renal and circulatory failure follow, which can be fatal. Burn patients are treated with intravenous fluids to offset...
4.6K
Sound Intensity00:58

Sound Intensity

The loudness of a sound source is related to how energetically the source is vibrating, consequently making the molecules of the propagation medium vibrate. To measure the loudness of a source, the physical quantity of interest is the intensity. This is defined as the energy emitted per unit of time per unit of area perpendicular to the sound wave's propagation direction. Since the total energy is greater if the source vibrates for a longer duration and over a larger area, dividing the...
4.9K
Reducing Line Loss01:18

Reducing Line Loss

In a three-phase circuit, line loss is an indicator of energy dissipated as heat due to the resistance of transmission lines. To address this, incorporating transformers into the system—a step-up transformer at the source and a step-down transformer at the load—is a strategic solution. Two three-phase transformers are introduced to improve this.
With a step-up transformer at the source, the voltage is increased, thereby reducing the current in the transmission lines since power loss in...
396