Author Correction: Fabrication of transparent hemispherical 3D nanofibrous scaffolds with radially aligned patterns

Jeong In Kim1, Ju Yeon Kim2, Chan Hee Park3,4

  • 1Department of Bionanosystem Engineering, Graduate School, Chonbuk National University, Jeonju, 561-756, Republic of Korea.

Scientific Reports
|April 25, 2018
PubMed

Related Concept Videos

Milgram's Obedience to Authority02:20

Milgram's Obedience to Authority

Obedience to authority is classically demonstrated in a more famous series of social psychology experiments performed by Stanley Milgram. He was a social psychology professor at Yale who was influenced by the trial of Adolf Eichmann, a Nazi war criminal. Eichmann’s defense for the atrocities he committed was that he was “just following orders.”
7.4K
Cerebral Hemispheres01:05

Cerebral Hemispheres

The human brain, a complex organ, is functionally divided into two cerebral hemispheres—left and right. These hemispheres are interconnected by a structure of paramount importance, the corpus callosum. This substantial bundle of neural fibers is not just a bridge between the hemispheres but a crucial element for the brain's comprehensive functioning. It enables efficient communication between the two hemispheres, allowing each side of the brain to control and receive sensory and motor...
2.5K
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
301
Radial System Protection01:23

Radial System Protection

Radial systems employ time-delay overcurrent relays to reduce load interruptions. When a fault occurs, the nearest breaker opens first, while upstream breakers remain closed due to longer delay settings. This approach ensures minimal disruption to the rest of the system.
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
447
Power Factor Correction01:20

Power Factor Correction

The power transmission to a factory involves the transfer of apparent power, a combination of active and reactive power. The power factor measures how effectively electrical power is converted into useful work output. The ratio of the real power (KW) that does the work to the apparent power (KVA) supplied to the circuit.
557
Assessment of radial pulse01:11

Assessment of radial pulse

Assessment of Radial Pulse
The radial pulse, located at the wrist, is often the preferred site for assessing peripheral pulse because of its accessibility and dependability. The process of determining the radial pulse involves several steps:
1.5K