[Hanfeng Pre-dam Commissioning Eutrophication Status and Control Evaluation in Three Gorges Reservoir]
Bing Yang1, Bing-Hui He1, De-Bao Wang1
1Hanfeng Lake Stations of Ecological Environment Monitoring System, Three Gorges Project Construction Committee, Key Laboratory of Eco-environments in the Three Gorges Reservoir Region, Ministry of Education, College of Resources and Environment, Southwest University, Chongqing 400715, China.
Abstract:
To reduce the impact of Fluctuating Zone, the Three Gorges Reservoir pre-dam is rare in the world which is specially designed and is the largest artificial lake body in China. The ecological benefits of landscape, farmland and lake and the social benefits of livable city have been significantly enhanced since the successful commissioning of the Hanfeng Lake pre-dam system. The paper proposed the application of layered hydrology and water quality monitoring for analysis of Tributary runoff and lake body section in the pre-dam commissioning in the whole year, and a total of 17 measured indicators inlucding hydrological parameters such as v, H, etc, physical parameters such as T, pH, SD, DO, TSS etc. and chemical parameters such as permanganate index, Chl-a, TN, DN, NO3--N, NH4+-N, NO2--N, TP, DP, SRP etc. We found that the water quality was poor during beginning drain and impoundment period and was the worst in tributary inflow section of South River, while the best water quality was located in water section of regulating dam in February and October. The TLI Water Quality Evaluation and factor analyses performed have shown that the water body of Hanfeng Lake was slightly eutrophicated, and the main pollution indicators included DN, TN, NO3--N, TP. By the control of pre-dam in three Gorges to eutrophication in commissioning, we found that the average Chl-a reduction effect reached up to 57.73%, the average reduction rate of permanganate index was 28.12%, SRP, TP, TN, TSS, NO2--N, DN, DP etc. were on average cut down by 20.15%-22.81%, the average reduction rates of NH4+-N and NO3--N were 16.92%-18.74%, and the average eutrophic index of water body was reduced by 15.74%. The highest reduction average rate in lake form period appeared from January to March and October to December, and the lowest in river form period was during May to August.The analysis results showed that the commissioning of pre-dam was good and remarkable for controlling eutrophication, and cutting the concentrations of pollutant water storage in the Three Gorges.
More Related Videos
10:49Pre-clinical Evaluation of Tyrosine Kinase Inhibitors for Treatment of Acute Leukemia
Published on: September 18, 2013
07:22Standardizing a Non-Lethal Method for Characterizing the Reproductive Status and Larval Development of Freshwater Mussels Bivalvia: Unionida
Published on: October 4, 2019
Related Concept Videos
Veins as Blood Reservoirs
pre-mRNA Processing
Once about 20-40 ribonucleotides have been joined together by RNA polymerase, a group of enzymes adds a “cap” to the 5’ end of the growing transcript. In this process, a 5’ phosphate is replaced by modified guanosine that has a methyl group attached to it (7-Methyl...
Design Example: Creating a Hydraulic Model of a Dam Spillway
Pre-mRNA Processing: Modification of pre-mRNA Ends
Once about 20-40 ribonucleotides have been joined together by RNA polymerase, a group of enzymes adds a cap to the 5' end of the growing transcript. In this process, a 5' phosphate is replaced by modified guanosine that has a methyl group attached (7-methyl guanosine). This 5' cap helps...
Marcia's Theory of Identity Status
Chromatin Structure Regulates pre-mRNA Processing
The chromatin structure, especially...
