Related Experiment Video
Updated: Feb 7, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Pilot-scale bioelectrochemical system for simultaneous nitrogen and carbon removal in urban wastewater treatment
María Isabel San-Martín1, Raúl Mateos1, Begoña Carracedo1
1Chemical and Environmental Bioprocess Engineering Group, Natural Resources Institute (IRENA), Universidad de León, Avda. de Portugal 41, Leon 24009, Spain.
Abstract:
This study aims to characterize the performance of a 150 L bioelectrochemical system-based plant, during the simultaneous carbon and nitrogen removal from several waste streams of wastewater treatment plants. The bioelectrochemical system (BES) contained five electrode pairs (operated hydraulically and electrically in parallel) and was fed with either wastewater, centrate (nutrient-rich liquid stream produced during the dewatering of digested biomass), or a mixture of both over 63 days, with a hydraulic retention time of one day. Total organic carbon and total nitrogen removal rates averaged 80% and 70%, respectively, with a specific energy consumption of 0.18 kWh·m-3 (BES + ancillary equipment). This work also underlines the challenges of using BES for nitrogen removal, highlighting the limitations of the current design, and suggesting some strategies for improvement.
More Related Videos
09:49Use of a Battery of Chemical and Ecotoxicological Methods for the Assessment of the Efficacy of Wastewater Treatment Processes to Remove Estrogenic Potency
Published on: September 11, 2016
07:11Biofilm Removal Using Carbon Dioxide Aerosols without Nitrogen Purge
Published on: November 6, 2016
Related Concept Videos
The Nitrogen Cycle
The Carbon Cycle
Key Elements for Plant Nutrition
Pilot and Numeric Relaying
pH Scale
Overview of Nitrogen Metabolism
The largest pool of nitrogen available in the terrestrial ecosystem is gaseous nitrogen (N2) from the air, but this...