Estimating Sizes of Key Populations at the National Level: Considerations for Study Design and Analysis

Jessie K Edwards1, Sarah Hileman2, Yeycy Donastorg3

  • 1From the Department of Epidemiology, University of North Carolina at Chapel Hill: Chapel Hill, NC.

Abstract

Related Concept Videos

Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
582
Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
631
Estimating Population Standard Deviation01:26

Estimating Population Standard Deviation

When the population standard deviation is unknown and the sample size is large, the sample standard deviation s is commonly used as a point estimate of σ. However, it can sometimes under or overestimate the population standard deviation. To overcome this drawback, confidence intervals are determined to estimate population parameters and eliminate any calculation bias accurately. However, this only applies to random samples from normally distributed populations. Knowing the sample mean and...
3.4K
Estimating Population Mean with Known Standard Deviation01:16

Estimating Population Mean with Known Standard Deviation

To construct a confidence interval for a single unknown population mean μ, where the population standard deviation is known, we need sample mean as an estimate for μ and we need the margin of error. Here, the margin of error (EBM) is called the error bound for a population mean (abbreviated EBM). The sample mean is the point estimate of the unknown population mean μ.
The confidence interval estimate will have the form as follows:
(point estimate - error bound, point estimate +...
9.7K
Confidence Interval for Estimating Population Mean01:25

Confidence Interval for Estimating Population Mean

A point estimate of the population mean is obtained from a single sample. Such a point estimate does not represent a population well because it needs to account for variability in the population. Single point estimate can also be biased despite the sample being selected randomly. Thus, a point estimate is often unreliable. A confidence interval is needed to reduce this unreliability.
A confidence interval for the mean is a range of values that provides an estimate of the population mean. As the...
8.9K
Distributions to Estimate Population Parameter01:26

Distributions to Estimate Population Parameter

The accurate values of population parameters such as population proportion, population mean, and population standard deviation (or variance) are usually unknown. These are fixed values that can only be estimated from the data collected from the samples. The estimates of each of these parameters are sample proportion, the sample mean, and sample standard deviation (or variance). To obtain the values of these sample statistics, data are required that have particular distribution and central...