Related Experiment Video
Updated: Feb 5, 2026

Preparation and Analysis of In Vitro Three Dimensional Breast Carcinoma Surrogates
Published on: May 9, 2016
Use of a noninfectious surrogate to predict minute virus of mice removal during nanofiltration
David Cetlin1, Melanie Pallansch2, Coral Fulton2
1MockV Solutions, Inc., RD 22, Baltimore Road Rockville, Maryland, 20850.
Abstract:
Viruses can arise during the manufacture of biopharmaceuticals through contamination or endogenous expression of viral sequences. Regulatory agencies require "viral clearance" validation studies for each biopharmaceutical prior to approval. These studies aim to demonstrate the ability of the manufacturing process at removing or inactivating virus and are conducted by challenging scaled-down manufacturing steps with a "spike" of live virus. Due to the infectious nature of these live viruses, "spiking studies" are typically conducted in specialized biological safety level-2 facilities. The costs and logistics associated with these studies limit viral clearance analysis during process development and characterization. In this study, a noninfectious Minute Virus of Mice-Mock Virus Particle (MVM-MVP) was generated for use as an economical small virus spiking surrogate. An immunoglobin G containing solution was spiked with live MVM or MVM-MVP and processed through Planova nanofiltration units. Flux decay data was collected and particle reduction values were calculated from TCID50 and Immuno-qPCR analysis. The data indicated comparable filtration performance and particle reduction between infectious MVM and noninfectious surrogate, MVM-MVP. This proof of concept study suggests the feasibility of utilizing MVPs for predictive size-based viral clearance assessments during process development and characterization as an alternative to homologous infectious virus.
Related Concept Videos
Predicting Molecular Geometry
What are Viruses?
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...
Sensitivity, Specificity, and Predicted Value
Sensitivity is the...
Predicting Reaction Outcomes

