Related Experiment Video
Updated: Jan 24, 2026

08:01
Generation and Expansion of Primary, Malignant Pleural Mesothelioma Tumor Lines
Published on: April 21, 2022
2.2K
Primary peritoneal carcinosarcoma (malignant mixed mullerian tumors)
Yueh-Han Hsu1, Min Cheng1, Peng-Hui Wang2
1Department of Obstetrics and Gynecology, Taipei Veterans General Hospital, Taipei, Taiwan; Department of Obstetrics and Gynecology, National Yang-Ming University, Taipei, Taiwan.
Taiwanese Journal of Obstetrics & Gynecology
|May 25, 2019
Summary
No abstract available in PubMed .
Related Concept Videos
Peritoneal Dialysis II: Peritoneal Dialysis Systems and Complications
643
Peritoneal dialysis (PD) is a medical process that removes waste products and excess fluid from the body using the peritoneal membrane as a natural filter.Peritoneal Dialysis MethodsSeveral methods can be used for peritoneal dialysis, including Acute Intermittent Peritoneal Dialysis, Continuous Ambulatory Peritoneal Dialysis, and Automated Peritoneal Dialysis, also known as Continuous Cyclic Peritoneal Dialysis.Acute Intermittent Peritoneal Dialysis (AIPD) is used for patients with uremic...
643
Mixing Concrete
373
Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
373
Mixing Time
475
The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
475
Ready Mixed Concrete
354
Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
354
Peritoneal Dialysis I: Introduction and Procedure
2.8K
Peritoneal dialysis (PD) is a procedure that facilitates the exchange of solutes, waste products, electrolytes, and excess fluid between the blood in the peritoneal capillaries and a dialysis solution introduced into the peritoneal cavity.Principles of Peritoneal Dialysis (PD)Diffusion: Waste products such as urea and electrolytes move from high concentrations in the blood to low concentrations in the dialysate across the peritoneal membrane. This mechanism is driven by the concentration...
2.8K
Design Example: Vintage Mixing Console
560
A sound engineer at a music company recently encountered a problem. The output from their newly acquired studio's vintage mixing console was too low for the requirements of modern recording equipment. To rectify this situation, the engineer decided to design an audio pre-amplifier using an operational amplifier (op-amp) to boost the signal level.
The specifications for the pre-amplifier were clear. It needed to amplify the audio signal by a factor of 10, have an input impedance above 10...
The specifications for the pre-amplifier were clear. It needed to amplify the audio signal by a factor of 10, have an input impedance above 10...
560

