Related Experiment Video
Updated: Jan 23, 2026

Ultrasound Images of the Tongue: A Tutorial for Assessment and Remediation of Speech Sound Errors
Published on: January 3, 2017
Measurement and Prediction of Binaural-Temporal Integration of Speech Reflections
Jan Rennies1,2, Anna Warzybok3, Thomas Brand3
11 Department of Speech, Language and Hearing Sciences, Boston University, Boston, MA, USA.
Abstract:
For speech intelligibility in rooms, the temporal integration of speech reflections is typically modeled by separating the room impulse response (RIR) into an early (assumed beneficial for speech intelligibility) and a late part (assumed detrimental). This concept was challenged in this study by employing binaural RIRs with systematically varied interaural phase differences (IPDs) and amplitude of the direct sound and a variable number of reflections delayed by up to 200 ms. Speech recognition thresholds in stationary noise were measured in normal-hearing listeners for 86 conditions. The data showed that direct sound and one or several early speech reflections could be perfectly integrated when they had the same IPD. Early reflections with the same IPD as the noise (but not as the direct sound) could not be perfectly integrated with the direct sound. All conditions in which the dominant speech information was within the early RIR components could be well predicted by a binaural speech intelligibility model using classic early/late separation. In contrast, when amplitude or IPD favored late RIR components, listeners appeared to be capable of focusing on these components rather than on the precedent direct sound. This could not be modeled by an early/late separation window but required a temporal integration window that can be flexibly shifted along the RIR.
Related Concept Videos
The Sense of Self: Reflected Self-Appraisal and Social Comparison
Predicting Molecular Geometry
Reflection of Waves
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...
Sensitivity, Specificity, and Predicted Value
Sensitivity is the...

