On the Road to a HIV Cure: Moving Beyond Berlin and London

Nikolaus Jilg1, Jonathan Z Li2

  • 1Massachusetts General Hospital, 55 Fruit Street, Boston, MA 02114, USA; Harvard Medical School, 25 Shattuck Street, Boston, MA 02115, USA.

Related Concept Videos

Curing of Concrete01:20

Curing of Concrete

The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
354
Curing Methods01:26

Curing Methods

Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
284
Accelerated Curing of Concrete01:25

Accelerated Curing of Concrete

Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
452
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
337
Magnetic Field due to Moving Charges01:23

Magnetic Field due to Moving Charges

A stationary charge creates and interacts with the electric field, while a moving charge creates a magnetic field.
Consider a point charge moving with a constant velocity. Like the electric field, the magnetic field at any point is directly proportional to the magnitude of the charge and inversely proportional to the square of the distance between the source point and the field point. However, unlike the electric field, the magnetic field is always perpendicular to the plane containing the line...
11.5K
Conservation of Mass in Moving, Nondeforming Control Volume01:14

Conservation of Mass in Moving, Nondeforming Control Volume

Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
1.3K