A failed review of CCE site inspection standards and processes

Stanley I Innes1, Charlotte Leboeuf-Yde1,2, Bruce F Walker1

  • 11College of Science, Health, Engineering and Education, Murdoch University, Murdoch, Australia.

Abstract

Related Concept Videos

Methods of Documentation V: CBE01:23

Methods of Documentation V: CBE

Charting by Exception, or CBE, is a method of documentation used in healthcare, particularly in nursing, that focuses on documenting only significant or abnormal findings rather than recording every detail. This approach aims to streamline the documentation process, improve efficiency, and ensure that healthcare providers can quickly identify deviations from normalcy in patient assessments.
In CBE, healthcare professionals establish predefined standards of practice that define what constitutes...
1.4K
Quality Control01:05

Quality Control

Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
1.2K
Deleterious Substances in Aggregate01:25

Deleterious Substances in Aggregate

Deleterious substances in aggregates can be detrimental to the quality and durability of concrete. These substances include organic impurities like loam, which interfere with cement hydration and are usually present in the sand. These prevent a good bond between aggregate and cement paste. Organic impurities can be detected using the colorimetric test, where the darkness of a solution after agitation indicates the level of organic content.
Another type of impurity is clay and fine material that...
487
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
318
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
362
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
919