Optimal placement of phasor measurement units considering islanding contingency, communication infrastructure, and
M M H Elroby1, S F Mekhamer2, H E A Talaat2
1Electrical Engineering Department, Faculty of Engineering, Ain Shams University, Egypt.
Abstract:
In this study, the PMUs are placed to operate in normal and islanded cases taking into account power system observability, reliability, Communication Infrastructure (CI), and latency time associated with this CI. Moreover, the economic study for additional new data transmission paths is considered as well as the preexisting Communication Devices (CDs) and the availability of predefined locations of some PMUs in some buses. The PMUs placement and their communication network topology and link channel capacity are co-optimized simultaneously. Two different approaches are applied to optimize the objective function; the first approach is combined from Binary Teaching Learning Based Optimization Algorithm (BTLBOA) and the Minimum Spanning Tree (MST) algorithm, while the second approach is based on BTLBOA. The proposed approaches are examined using IEEE 118-bus systems.
Related Concept Videos
Zones of Protection
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Transmission Line Design Considerations
Line Protection with Impedance Relays
Under normal conditions, low load currents keep the measured...
Maximum Power Flow and Line Loadability
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Power System Three-Phase Short Circuits