Related Experiment Video
Updated: Jan 2, 2026

Full-field Strain Measurements for Microstructurally Small Fatigue Crack Propagation Using Digital Image Correlation Method
Published on: January 16, 2019
Microstructure and Pitting Corrosion of Austenite Stainless Steel after Crack Arrest
Zhuwu Zhang1, Guangguo Pan1, Yan Jiang2
1Oil and Gas Storage and Transportation Engineering Department, College of Chemical Engineering, Fuzhou University, Fuzhou 350116, China.
Abstract:
With synergy of plastic deformation near crack tip and pulse current treatment, complex phase transformation and recrystallization occur in the metallographic structure, with the austenite transforming to fine grain structure and deformation-induced martensite; but, without the plastic deformation, the phase transformation, and recrystallization it was difficult for the crack arrest process to take place only undergoing the pulse current treatment. The nano-indentation experiment showed that the phase transformation region contained the maximum residual compressive stress consisting of four parts: the plastic stress, the explosion stress, the thermal stress, and the transformation stress, which was beneficial to restrain the crack growth. However, the solidification structure and the deformation-induced martensite structure was vulnerable to pitting corrosion through scanning microelectrode technology (SMET) and pitting corrosion experiment, but the pitting corrosion resistance could be improved through the solution heat treatment.
Related Concept Videos
Corrosion of Reinforcement
However, over time and under certain conditions like carbonation, chloride ingress, and cracking this protective state can be compromised. Steel has areas with...
Microcracking in Concrete
Corrosion
Mechanical Characteristics of Steel
The tension test is fundamental for determining tensile strength. In this test, a steel specimen is stretched using a gripping device until it breaks. The data collected during this test are used...
Types of Non-structural Cracks in Concrete
Plastic shrinkage cracks typically form within hours after the concrete is poured. The concrete's surface dries faster than the bottom, creating tensile stress that the still-plastic concrete cannot withstand, leading to diagonal or randomly patterned cracks on the concrete surface.
Residual Stresses

