Abstract:
Horizontal displacements of a multiple-anchor pile wall in a 28.5 m deep excavation using the top-down construction method have been monitored using optical fiber (Brillouin optical time-domain reflectometry (BOTDR)), strain gauges, inclinometers, and a topographic survey. This work presents a comparison between these different techniques to measure horizontal displacements in the pile at several stages of the soil excavation process. It was observed that displacements can be separated into two components: Rigid body motion and pile flexural deformation. Measurements using optical fiber and inclinometers are considered the most adequate and easy to install. A numerical model allows us to evaluate the influence of earth pressure on the estimated horizontal displacements. It is shown that using soil pressure on the wall given by p = 0.65Kaγh, on a simplified modeled wall, provides a close deduction of horizontal displacements compared to observed values on the field.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Laying Concrete Masonry
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
Preplaced Aggregate Concrete
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Reinforced Brick Masonry
To fortify brick walls...