Monitoring a 28.5 m High Anchored Pile Wall in Gravel Using Various Methods

Ricardo Moffat1, Pablo Parra1, Miguel Carrasco1

  • 1Faculty of Engineering and Sciences, Universidad Adolfo Ibáñez, Av. Diagonal Las Torres, 20700, Peñalolén, Santiago 7941169, Chile.

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
356
Posttensioned Masonry Walls01:15

Posttensioned Masonry Walls


Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
415
Laying Concrete Masonry01:16

Laying Concrete Masonry

Constructing a concrete masonry wall involves a series of steps designed to ensure durability, stability, and alignment. The construction starts with preparing the base, which includes cleaning the area where the wall will be erected. The next step involves spreading mortar where the first row of concrete blocks will be laid, typically starting at a corner section to help define the wall's boundaries.
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
311
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
311
Slump Test01:20

Slump Test

The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
730
Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
1.5K